This includes:
- road, bike path and footpath surfaces
- bollards, pedestrian fences and safety barriers
- drains
- nature strips
- signs and poles
- parking infrastructure including meters, line markings and signange
- traffic management infrastructure including line markings and safety barriers
- street lighting and light poles in certain areas.
Road network condition survey
Infrastructure Management Group are undertaking an assessment of the City of Melbourne’s 448 km network of sealed roads.
Inspection work will begin Friday 7 April 2023 and take approximately two weeks to complete.
How this affects you
During inspection works period, you may notice camera-equipped inspection vehicles travelling on local roads around your work, residence or other locations within the municipality.
All cameras used in the survey will be focused on the road and kerb surface structure with some limited viewing of areas directly adjacent. No image recordings of commercial or residential, private properties or structures will be undertaken.
Vehicles are clearly identifiable and will operate within the normal surrounding traffic patterns. Some hazard lighting and other warning devices will be in operation while completing laser measurement and video recording activities of roads and access ways.
The information gained from this exercise will enable better management of this important community asset, enabling more effective maintenance and renewal strategies to improve connectivity, mobility and safety.
Report an issue
You can report cleaning or maintenance issues online.
If there is any danger to the public or public space, please call us immediately on 03 9658 9658.